Planning October 30, 2026 · 18 min read

Basement Finishing Permit Drawings: A Contractor's Complete Checklist

Learn how to prepare building permit drawings for finished basements. Discover the required sheet set, IRC ceiling heights, egress window codes, and plan check tips.

AW

Drafting & Permit Documentation · ArchWorkPro

ArchWorkPro combines AI-assisted drafting with licensed-professional review to deliver permit-ready construction documents for contractors, builders, designers, and homeowners nationwide.

Basement Finishing Permit Drawings: A Contractor's Complete Checklist

Finishing a residential basement appears straightforward on the surface: framed perimeter walls, drywall, flooring, recessed lights, and perhaps a bathroom or wet bar. Yet municipal building departments reject basement permit applications more frequently than almost any other interior remodel.

The reason is simple. Basements are subterranean environments governed by strict life-safety, structural, and building science provisions in the International Residential Code (IRC). When a contractor or homeowner submits rough sketches that ignore ceiling duct drop clearances, concealed wall fireblocking, foundation wall cutting details, or mechanical room combustion air, the plan examiner immediately issues a plan check correction notice.

Whether you are a general contractor managing four basement projects simultaneously or an owner-builder expanding living space, this comprehensive guide details every sheet, dimension, and code requirement needed in basement permit drawings to sail through municipal review.


Why Municipalities Require Basement Permit Drawings

Many homeowners mistakenly believe that because basement finishing occurs entirely inside an existing foundation, it does not require a permit. That assumption leads to costly stop-work orders, retroactive inspection penalties, and major title issues during home sales.

Local building officials mandate complete drawings for basement permit submittals to verify five critical safety standards before construction begins:

  1. Life Safety and Emergency Egress: Ensuring occupants can escape during a fire, and firefighters can enter with full gear.
  2. Structural Integrity: Verifying that cutting window wells, relocating lally columns, or framing new load-bearing walls does not compromise the upper floors.
  3. Fire Containment: Ensuring vertical and horizontal concealed draft openings are fireblocked to prevent rapid flame spread behind drywall.
  4. Moisture and Mold Prevention: Confirming proper vapor retarders, pressure-treated plates, and thermal insulation meet energy codes without trapping subterranean condensation.
  5. Combustion Appliance Safety: Ensuring newly framed walls do not starve gas furnaces or water heaters of essential combustion oxygen, causing lethal carbon monoxide buildup.

Contractors who provide professional, dimensioned CAD drawings avoid back-and-forth plan check delays, protect their builder margins, and establish immediate credibility with city plan examiners.


The Complete Sheet Set Required for Basement Permit Drawings

A complete permit set for a basement finishing project is not a single floor plan. Building departments expect a multi-sheet set drawn to standard architectural scale (typically 1/4 inch equals 1 foot) on 18x24 inch or 24x36 inch sheets.

Here is the exact sheet breakdown that satisfies municipal plan examiners across the United States:

Sheet Number Sheet Title Core Technical Information Required
A-000 Cover Sheet & Code Matrix Project address, owner and contractor details, scope of work, adopted building codes (IRC, NEC, IPC/UPC, IECC), total square footage of finished area, drawing index, and symbol legend.
A-101 Existing Basement / Demolition Plan As-built perimeter foundation walls, concrete thickness, structural support columns, load-bearing beams, staircase dimensions, mechanical equipment (furnace, water heater), electrical panel location, sump pump, and any walls or slabs scheduled for removal.
A-102 Proposed Architectural Floor Plan New partition walls, room designations (recreation room, home theater, office, bedroom, bathroom), door sizes and swing directions, window sizes, smoke and carbon monoxide detector locations, and clear room dimensions.
A-103 Reflected Ceiling & Electrical Plan Ceiling heights throughout, soffit and bulkhead drops under beams or ducts, lighting fixture layout, switched outlets, GFCI and AFCI circuit designations, and exhaust fan venting routes.
A-104 Egress Window & Well Details Window net clear opening dimensions, sill height above finished floor, foundation opening cut details, header/lintel sizing, window well projection, gravel drainage bed, and ladder specifications.
A-105 Wall Assemblies & Fireblocking Sections Sectional details showing perimeter foundation insulation, air gaps, framing stud spacing, pressure-treated bottom plates, drywall thickness, and vertical/horizontal fireblock locations.
M/P-101 Mechanical & Plumbing Schematics Combustion air calculations and louver dimensions for enclosed equipment rooms, supply and return duct runs, bathroom plumbing rough-in layout, backwater valve location, and sewage ejector pump details.

To see how these individual sheets fit into broader residential submittals, review our detailed guide on what is in a residential permit set and explore our full permit drawing services.


The 5 Code Triggers That Fail Basement Plan Checks

Municipal plan reviewers review hundreds of plans every month. When inspecting basement submittals, they check five specific code sections first. If your plans fail any of these five items, a redline rejection is virtually guaranteed.

+--------------------------------------------------------------------------+
|                     COMMON BASEMENT PLAN CHECK PITFALLS                  |
+--------------------------------------------------------------------------+
|  1. CEILING HEIGHTS: Under 7'0" in living areas or under 6'4" under ducts  |
|  2. EGRESS WINDOWS: Missing 5.7 sq ft net opening or sill above 44"      |
|  3. FIREBLOCKING: Missing top-of-wall and 10' horizontal barrier notes   |
|  4. MOISTURE BARRIERS: Untreated wood touching concrete or bad insulation |
|  5. COMBUSTION AIR: Wall framing that starves gas furnaces or water heaters |
+--------------------------------------------------------------------------+

1. Ceiling Height Clearances (IRC Section R305)

Ceiling height is the single most common reason basement permit applications receive plan check correction comments. Basements frequently have low floor-to-joist clearances, further restricted by main trunk ducts, plumbing waste lines, and steel support girders.

Under Section R305 of the International Residential Code:

  • Habitable Rooms: Habitable spaces, hallways, and basements must have a minimum ceiling height of 7 feet 0 inches (84 inches) from finished floor to finished ceiling.
  • Beams, Girders, and Ducts Exception: Beams, girders, ducts, and other structural or mechanical obstructions may project down to 6 feet 4 inches (76 inches) above finished floor, provided they are spaced reasonably and do not obstruct primary passage.
  • Bathrooms and Laundry Rooms: Must maintain a minimum clearance of 6 feet 8 inches over fixtures and walking areas.
  • Stairway Headroom: Stairways must provide continuous vertical clearance of at least 6 feet 8 inches (80 inches) measured vertically from the sloped plane adjoining the tread nosing to the lowest ceiling projection above.

Your basement permit drawings must include spot elevations and cross-section callouts showing the exact height from the top of the finished floor to the underside of finished drywall bulkheads. Omitting these specific dimension callouts triggers an automatic plan check comment.

2. Emergency Escape and Rescue Openings (IRC Section R310)

If your finished basement design includes a bedroom, sleeping room, or habitable space, emergency egress is legally mandatory. Section R310 of the IRC states:

  • Basements with habitable spaces must have at least one emergency escape and rescue opening.
  • If a basement contains one or more sleeping rooms (bedrooms), every individual bedroom must have its own dedicated emergency escape opening leading directly to the outdoors.

To qualify as a code-compliant egress window, the opening must satisfy four exact geometric criteria:

  • Minimum Net Clear Opening Area: At least 5.7 square feet (or 5.0 square feet for grade-floor openings).
  • Minimum Net Clear Opening Height: At least 24 inches.
  • Minimum Net Clear Opening Width: At least 20 inches.
  • Maximum Finished Sill Height: No higher than 44 inches above the finished floor.
       +-----------------------------------------+
       |   CODE-COMPLIANT EGRESS WINDOW OPENING  |
       |                                         |
       |   Net Clear Opening: >= 5.7 sq ft       |
       |   Net Clear Height:  >= 24 inches       |
       |   Net Clear Width:   >= 20 inches       |
       +-----------------------------------------+
                          |
                          | Maximum 44" above floor
                          v
=================================================== FINISHED FLOOR

Notice that meeting the minimum 24-inch height and minimum 20-inch width simultaneously only yields 3.33 square feet (24" x 20" / 144 = 3.33 sq ft). That does NOT meet the mandatory 5.7 square foot requirement. If your window is 24 inches high, it must be at least 34.2 inches wide. If it is 20 inches wide, it must be at least 41 inches high.

Window Well Requirements (IRC Section R310.2.3)

When an egress window sill sits below the exterior ground level, an egress window well must be built. The permit drawings must document:

  • Horizontal Projection: The well must extend at least 36 inches horizontally from the outer face of the window.
  • Total Floor Area: The horizontal area of the well must be at least 9.0 square feet.
  • Ladders and Steps: If the window well depth exceeds 44 inches below ground grade, a permanently affixed ladder or steps must be installed. The ladder cannot encroach into the required 36-inch clearance by more than 6 inches, rungs must be at least 12 inches wide, and vertical rung spacing cannot exceed 18 inches.
  • Drainage: The bottom of the window well must tie into the foundation perimeter drain system or sit over a gravity drainage bed of crushed washed gravel.

3. Fireblocking in Concealed Spaces (IRC Section R302.11)

In an unfinished basement, concrete foundation walls and exposed floor joists leave little opportunity for hidden fire spread. But once you frame 2x4 stud walls against the foundation and install drywall, you create vertical and horizontal hollow wall cavities.

During a house fire, these cavities act as open chimneys, drawing flames, superheated gases, and smoke directly from the basement upward into the floor system and exterior walls of the upper levels.

IRC Section R302.11 mandates fireblocking in specific locations:

  • Top of Wall: Continuous fireblocking must be installed at the top of all perimeter stud walls, sealing the space between the framed wall top plate and the concrete foundation or rim joist.
  • Horizontal Intervals: In stud walls, fireblocking must be installed horizontally at intervals not exceeding 10 feet.
  • Drop Ceilings and Soffits: Fireblocking must seal the connection between framed horizontal soffits (around ducts or steel beams) and vertical wall cavities.
  • Stairway Openings: Concealed spaces beneath stair stringers must be fireblocked.

Acceptable fireblocking materials include 2-inch nominal lumber, two layers of 1-inch nominal lumber, 3/4-inch structural wood panels (plywood or OSB), 1/2-inch gypsum board, or approved expanding fire-rated foam sealant tested to ASTM E136.

Your drawings must include a typical wall section detail explicitly showing where fireblocking will be installed. Without this detail, inspectors on site will fail the rough framing inspection.

4. Moisture Control and Vapor Retarders (IRC Section R317 & Energy Code)

Below-grade concrete foundation walls constantly absorb groundwater through capillary action. If wood framing or fiberglass insulation rests directly against damp concrete, moisture wicks inward, causing timber rot, structural degradation, and toxic mold blooms behind finished drywall.

Plan examiners verify four moisture control items on your permit drawings:

  1. Pressure-Treated Sole Plates: All wood sill plates and bottom partition plates in direct contact with concrete slabs or foundation walls must be preservative-treated lumber (or approved decay-resistant species) anchored with corrosion-resistant fasteners (IRC R317.1).
  2. Capillary Break: A closed-cell polyethylene sill sealer foam gasket must be specified between the treated bottom plate and the concrete slab.
  3. Continuous Foundation Insulation: Modern energy codes (IECC / IRC Chapter 11) require continuous rigid foam insulation (such as R-10 or R-15 extruded polystyrene / XPS or polyisocyanurate) installed directly against the interior face of the concrete wall, or closed-cell spray foam.
  4. Permeable Wall Assemblies: The wall assembly must allow internal wall cavity drying. Drawing details should show an intentional 1/2-inch to 1-inch air gap between the rigid insulation and the back face of the wood framing studs.

5. Enclosed Mechanical Equipment and Combustion Air

Enclosing an existing furnace and water heater inside a newly framed basement utility closet is one of the most hazardous basement remodeling mistakes.

Standard atmospheric gas-fired appliances draw oxygen from surrounding air to burn fuel cleanly and draft exhaust up the chimney flue. When you frame tight partition walls around a furnace and water heater, the equipment quickly consumes all available oxygen in the small room.

This leads to incomplete fuel combustion, soot production, and deadly carbon monoxide backdrafting into the living quarters.

Your drawings for basement permit must include:

  • Room Volume Calculations: If the room volume is less than 50 cubic feet per 1,000 BTU/hr of aggregate input appliance rating, high and low combustion air openings must be provided.
  • Combustion Air Openings: Specifying two permanent openings (one within 12 inches of the ceiling, one within 12 inches of the floor) communicating with well-ventilated rooms or directly with the outdoors via dedicated metal ducts.
  • Clearances to Combustibles: Maintaining required manufacturer clearances around water heaters (typically 1 to 6 inches) and furnaces (typically 3 to 6 inches from sides and rear, and 24 to 30 inches in front of service access doors).

Foundation Cutting and Structural Alterations

Adding a new egress window or expanding an existing hopper window requires cutting into the existing reinforced concrete or concrete masonry unit (CMU) foundation wall. This directly impacts the structural bearing capacity supporting your home's exterior walls and roof loads.

+--------------------------------------------------------------------------+
|                  STRUCTURAL FOUNDATION CUTTING PROTOCOL                  |
+--------------------------------------------------------------------------+
|  1. TEMPORARY SHORING: Shore joists above before cutting foundation     |
|  2. CONCRETE CUTTING: Precision wet saw cut to prevent over-cutting      |
|  3. STRUCTURAL LINTEL: Install steel angle or concrete lintel across top |
|  4. REBAR ANCHORING: Epoxy-set rebar pins into existing foundation       |
|  5. WATERPROOFING: Bituminous membrane and perimeter drainage tie-in     |
+--------------------------------------------------------------------------+

When Is a Structural Engineer Stamp Required?

In many jurisdictions, cutting a foundation opening wider than 48 inches, cutting within 24 inches of a foundation corner, or modifying a point-load foundation pier requires a licensed Professional Engineer (PE) or Registered Architect (RA) stamp.

When your permit set includes structural alterations, the drawing must detail:

  • Temporary Shoring: Specifying screw jacks and temporary bearing walls to support existing floor joists prior to concrete saw cutting.
  • Structural Lintel / Header: Steel lintel sizing (e.g., dual L4x3x1/4-inch structural steel angles) or an engineered concrete lintel bearing at least 6 to 8 inches onto the sound concrete wall on each side of the cut.
  • Sill and Jamb Reinforcement: Edge sealing, epoxy-anchored dowels, and structural window bucks bolted to the cut concrete face with 1/2-inch wedge anchors spaced 16 inches on center.

For complex structural requirements and multi-state stamping rules, see our breakdown on who can stamp architectural drawings.


Below-Grade Plumbing and Drainage Rough-Ins

Adding a full or half bathroom to a finished basement adds substantial property appraisal value. However, plumbing below the municipal sewer line presents unique drainage challenges that must be documented on the mechanical/plumbing sheet.

1. Concrete Slab Trenching

The plumbing schematic must show the proposed waste line layout, trenching paths through the existing 4-inch concrete slab, pipe slope (minimum 1/4 inch per foot for pipes 2-1/2 inches or smaller; 1/8 inch per foot for 3-inch pipes), and tie-in points to the existing main building drain.

2. Sewage Ejector Systems

If the municipal sewer main exits the house several feet above the basement slab elevation, gravity drainage from toilets and showers is impossible. The plans must detail:

  • A sealed, gas-tight sewage ejector basin set into the concrete floor.
  • A submersible solids-handling ejector pump (capable of passing 2-inch spherical solids).
  • A dedicated full-size plumbing vent line tied into the home's main roof vent stack.
  • A check valve and full-way gate valve installed on the pump discharge pipe to prevent sewage backflow.

3. Backwater Valves

Many municipal sanitary districts now mandate backwater valves on all basement drainage fixtures. During severe municipal storm events, public sewers can surcharge and back up through basement floor drains and showers. Specifying an accessible, code-approved backwater valve protects the home and satisfies city utility inspectors.


Contractor Economics: Hand Sketches vs. Outsourced CAD Drafting

For general contractors and design-build remodelers, preparing permit drawings in-house is one of the most persistent drains on business profitability.

A contractor who spends 20 to 30 unbillable evening hours measuring, drawing, erasing, and formatting plan sheets in AutoCAD or SketchUp is losing time that should be spent bidding new jobs, managing subcontractors, and ordering materials. Worse, if hand sketches or incomplete drawings are submitted, the city issues correction notices that delay the project start date by 4 to 8 weeks.

ESTIMATED TIME TO SECURE A BASEMENT PERMIT:
Hand-Drawn Sketches:     8 to 14 weeks (multiple rejections and resubmittals)
In-House Contractor CAD: 6 to 9 weeks (burns 25+ billable contractor hours)
ArchWorkPro CAD Set:     2 to 4 weeks (first-round pass rate with free revisions)

Here is how the four primary drafting options compare for a typical 1,200-square-foot basement finishing project:

Drafting Approach Direct Cost Turnaround Time Plan Check Risk Business Impact
Hand-Drawn Sketches $0 out-of-pocket 3 to 7 days to sketch Very High (90% reject rate) Inevitable delays; undermines contractor professionalism with clients and city inspectors.
In-House Contractor CAD $1,500 to $2,500 (in lost billable owner hours) 10 to 20 days Medium Pulls the contractor away from job site supervision, estimating, and sales.
Local Traditional Architect $3,500 to $7,500 4 to 8 weeks Low Expensive fees erode project profit margins; long design backlog delays start date.
ArchWorkPro ($1.00/sq ft) $1,200 flat fee Delivered in days Very Low Maximum margin protection; 2-hour quote response; unlimited plan check corrections included.

By partnering with an architectural drafting specialist, contractors secure complete, permit-ready CAD sets for a flat, published price of $1.00 per square foot ($1,200 project minimum). You receive clean, layered DWG and plot-ready PDF sheets in days, with all municipal correction comments addressed at zero additional cost.

Explore our transparent drafting pricing and see how contractors streamline their project pipeline with our services for contractors.


Step-by-Step: Moving From Field Measurements to Permit in Hand

Securing a basement building permit follows an orderly 6-step workflow:

[Step 1: Field As-Builts] 
       │  (Laser measure perimeter, joists, duct drops, posts, plumbing)
       ▼
[Step 2: 2D CAD Draft] 
       │  (Generate existing A-101 and proposed A-102 floor plans)
       ▼
[Step 3: Code Layering] 
       │  (Verify R305 heights, R310 egress, R302.11 fireblocking)
       ▼
[Step 4: MEP & Details] 
       │  (Add combustion air math, electrical circuits, window sections)
       ▼
[Step 5: Municipal Submittal] 
       │  (Submit PDFs via city online portal with application fees)
       ▼
[Step 6: Plan Check Approval] 
       │  (Permit issued; pull trade permits and begin framing)

Step 1: Laser As-Built Field Measurements

Before drawing a single line, record accurate dimensions of the existing basement:

  • Foundation wall lengths and overall diagonal cross-measurements to verify wall squareness.
  • Concrete slab thickness (if exposed) and slab elevations.
  • Joist size, species, spacing (16" or 24" O.C.), and clear span directions.
  • Lowest drop points of structural steel girders, wood beams, and main HVAC trunk lines.
  • Locations of water main meters, gas shutoffs, electrical panels, water heaters, and furnaces.
  • Existing window rough openings, sill heights above the slab, and outside grade depths.

Step 2: Develop the Existing Demolition Plan

Draft the as-built conditions on Sheet A-101. Show all existing concrete walls, bearing posts, staircases, and mechanical equipment. Clearly indicate with dashed lines any concrete slab saw-cutting, post relocations, or ductwork rerouting.

Step 3: Space Planning and Architectural Floor Plan

Design the proposed layout on Sheet A-102. Ensure door swings do not collide with stair treads or mechanical doors. Verify that hallway widths maintain a minimum 36 inches clear, and that full bathrooms satisfy plumbing fixture clearance standards (21 inches in front of toilets and lavatories, 30x30 inch minimum interior shower footprint).

Step 4: Detail Life-Safety and MEP Assemblies

Add Sheet A-103, A-104, and A-105. Incorporate reflected ceiling heights, egress window cross-sections, foundation cut details, fireblocking callouts, and electrical device symbols (switches, receptacles, smoke/CO alarms). Calculate and note combustion air provisions on mechanical sheets.

Step 5: Submit to the Building Department

Submit the complete digital PDF plan set through the municipal online permitting portal. Include the building permit application, contractor license and insurance documentation, and plan check review fees.

For insights into city processing timelines and contractor scheduling, read our guide on how long does a residential permit set take.

Step 6: Plan Check Review and Corrections

Municipal plan examiners typically review basement permit applications within 10 to 20 business days. If the reviewer issues plan check correction comments, simply send the redline markup list to ArchWorkPro. We revise the CAD sheets and provide updated, re-clouded drawings for resubmission immediately.


The Complete Contractor Checklist for Basement Permit Submittals

Use this quick-reference checklist before submitting your next basement set to the building department:

  • Cover Sheet: Project scope, owner/builder info, and current adopted building codes clearly cited.
  • Ceiling Heights: Spot elevations indicate minimum 7'0" in living areas and minimum 6'4" under ducts/beams.
  • Stairway Headroom: Continuous 6'8" clearance documented along entire stair rake and landings.
  • Egress Window: Net clear opening >= 5.7 sq ft, width >= 20", height >= 24", sill height <= 44".
  • Egress Window Well: Minimum 36" horizontal projection, area >= 9 sq ft, permanent ladder if depth > 44".
  • Fireblocking Details: Section callouts show fireblocking at top of perimeter walls and every 10' horizontally.
  • Treated Lumber: Bottom plates specified as preservative-treated with sill sealer foam gaskets.
  • Foundation Insulation: Continuous R-10 or R-15 rigid foam or closed-cell spray foam insulation specified.
  • Mechanical Ventilation: Combustion air calculations and louver sizing noted for enclosed equipment rooms.
  • Smoke & CO Alarms: Hardwired, interconnected smoke alarms inside each bedroom and outside sleeping areas; carbon monoxide alarms on each level.
  • Plumbing Rough-Ins: Trenching, pipe slopes, backwater valve, and ejector pump venting fully detailed.
  • Electrical Circuits: Dedicated 20-amp circuits for bathrooms, AFCI protection on all bedroom/living outlets, GFCI on all wet areas.

To explore related permit drawing requirements for other residential remodel projects, read our guides on building permit drawings for additions and remodels and deck permit drawings.


Frequently Asked Questions

Do I need a permit to finish a basement if I am not moving any walls?

Yes. Virtually every municipal jurisdiction in the United States requires a building permit to finish a basement, even if you are not altering existing structural walls. A building permit is required whenever you install new framing, electrical circuits, plumbing pipes, HVAC ductwork, or drywall over foundation walls. Finishing a basement without a permit can void homeowner insurance coverage during a fire or flood and creates serious title disclosure liabilities when selling the home.

Can I finish a basement with a ceiling height under 7 feet?

IRC Section R305 sets 7 feet 0 inches as the standard minimum ceiling height for habitable spaces. However, many older homes have existing basement ceilings that measure 6 feet 8 inches to 6 feet 10 inches to the bottom of the floor joists. Some municipal jurisdictions have local code amendments allowing existing basement ceiling heights down to 6 feet 8 inches or 6 feet 6 inches for remodels of existing homes. Always check with your local plan examiner before submitting drawings for a low-ceiling basement.

What happens if I build a basement bedroom without an egress window?

If you install a bedroom in a basement without a code-compliant emergency egress window (or exterior door), the building department will not permit or classify the room as a legal bedroom. Real estate appraisers and listing agents cannot count unpermitted rooms as bedrooms when valuing the property. More importantly, sleeping in a room without emergency egress poses severe life-safety risks during a fire.

Does ArchWorkPro include electrical and plumbing layouts for basement sets?

Yes. ArchWorkPro provides complete residential permit drawing sets that include architectural floor plans, reflected ceiling and electrical lighting plans, egress window details, wall sections, and schematic plumbing layouts. When your project requires engineering calculations or stamped structural sheets, we coordinate with licensed professional engineers in your state as a separate line item.

How long does it take ArchWorkPro to deliver complete basement permit drawings?

Once you submit your project dimensions, as-built sketches, and scope of work, ArchWorkPro delivers your complete initial drawing set in days. We also deliver formal written price quotes within 2 working hours of your request.

What if the city building department issues plan check correction comments on the plans?

Plan check corrections are completely covered. ArchWorkPro includes unlimited free revisions and handles all municipal plan check correction notices as part of our standard service. Simply upload the city's redline review sheet, and our drafting team will adjust the CAD files and reissue approved sheets at zero additional cost.


Ready to Get Your Basement Permit Drawings Started?

Eliminate the stress of drafting, avoid costly plan check rejections, and keep your remodeling jobs moving on schedule. Whether you are a builder with a full project roster or a homeowner planning your dream basement living space, ArchWorkPro delivers permit-ready CAD plans for a flat $1.00 per square foot.

Request your instant 2-hour quote today or review our pricing page to start your project.

basement permit drawings drawings for basement permit finished basement basement finishing permit drawings cad drafting egress window