November 17, 2026 · 4 min read

Commercial Tenant Improvement (TI) Permit Drawings: ADA & Egress

Commercial lease fit-outs require fast, precise permit drawings. Here is what city plan examiners look for in tenant improvement drawing sets.

AW

Drafting & Permit Documentation · ArchWorkPro

ArchWorkPro combines AI-assisted drafting with licensed-professional review to deliver permit-ready construction documents for contractors, builders, designers, and homeowners nationwide.

Commercial Tenant Improvement (TI) Permit Drawings: ADA & Egress

What Are Commercial Tenant Improvement (TI) Permit Drawings?

When a commercial tenant signs a lease for an office, retail boutique, medical clinic, salon, or restaurant, the raw interior space (often an empty warm shell or previous business layout) must be customized. This renovation is known as a commercial tenant improvement (TI) or interior fit-out.

Before a commercial general contractor can pull demolition permits, frame interior walls, run plumbing wet lines, or install commercial HVAC ductwork, the local municipality requires a complete set of commercial tenant improvement permit drawings.

Unlike residential remodels governed by the IRC, commercial TI projects are reviewed under the International Building Code (IBC), the National Electrical Code (NEC), and federal ADA Accessibility Guidelines (ADAAG). Errors on TI plans can stall business openings and trigger thousands of dollars in lease penalty clauses.

The Core Sheets Required in a Commercial TI Drawing Set

Commercial plan examiners require a comprehensive multi-discipline sheet set:

Drawing Sheet Technical Purpose Key Code Requirements
Cover Sheet & Code Analysis Establishes legal use and occupancy classification Occupancy group (B, M, A-2, S), allowable area, occupant load calculation
Existing / Demo Plan Identifies structures to be removed Demolition boundaries, existing plumbing/electrical caps, fire barriers
Proposed Floor Plan Dimensioned layout of new partitions and rooms Wall ratings, door swing clearances, furniture/fixture layouts
Life Safety & Egress Plan Details path of travel in emergency scenarios Max travel distance to exits, illuminated exit sign locations, emergency lighting
Reflected Ceiling Plan (RCP) Details lighting, diffusers, and ceiling heights Acoustic ceiling grid layout, sprinkler head locations, return air grilles
ADA Restroom Elevations Accessible plumbing facility design Grab bar heights, 60-inch turning radius, pipe insulation, dispenser heights
MEP Schedules Mechanical, electrical, and plumbing specifications Panel schedules, load calculations, plumbing fixture unit counts, exhaust CFMs

Occupant load calculations form the legal foundation of the entire set. Under IBC Chapter 10, the total square footage divided by the occupant load factor determines the minimum number of required exit doors, total corridor width, and the required plumbing fixture count for male and female restrooms.

ADA Compliance: The Number One Plan Check Snag

The most frequent source of commercial TI plan check corrections is failure to document Americans with Disabilities Act (ADA) compliance:

  • Entry and Doorways: All public interior doorways must provide a minimum 32-inch clear width opening with compliant lever hardware. Push-pull maneuvering clearances must be dimensioned on the floor plan.
  • Corridor Widths: Primary interior commercial circulation corridors must maintain a minimum clear width of 44 inches when serving 50 or more occupants (36 inches minimum for lower loads).
  • Restroom Turning Circles: Commercial single-occupant and multi-stall restrooms must incorporate an unobstructed 60-inch circular turning space or a T-shaped turning clearance, with grab bars mounted between 33 and 36 inches above finished floor level.

Avoiding Landlord and Permit Delays

For commercial contractors and business owners, construction timing is directly tied to lease rent-commencement dates. If plan review takes eight weeks instead of three, the tenant may be forced to pay commercial rent on an unopened space.

ArchWorkPro eliminates drafting bottlenecks for commercial builders:

  • Predictable Fixed Pricing: 2D CAD drafting is priced at $1.00 per square foot of drawn area ($1,200 minimum).
  • Rapid Turnaround: Written quotes returned within 2 working hours; complete drawing sets delivered in days.
  • Free Plan Check Revisions: Plan check corrections are included at zero additional cost until your city approves the drawings.
  • Coordinated Professional Stamps: ArchWorkPro coordinates registered architect (RA) or professional engineer (PE) seals in your project state as a separate line item whenever required by local code.

Frequently Asked Questions

Do all commercial tenant improvements require an architect's stamp?

Most jurisdictions require an architect's stamp on commercial TI plans if the project involves a change of occupancy classification, structural modifications, or exceeds specific square footage thresholds (typically 3,000 to 5,000 sq ft). For smaller B (Business) or M (Mercantile) non-structural fit-outs, many building departments accept professional CAD drawings directly from licensed contractors.

Can ArchWorkPro draft from landlord lease outline drawings (LODs)?

Yes. Send us the landlord's lease outline drawing (LOD), existing space dimensions, and tenant space requirements, and our team will draft the complete, code-compliant commercial construction set.

How are commercial occupant loads calculated?

Occupant loads are calculated by dividing the usable floor area by the IBC Table 1004.5 occupant factor. For example, standard business offices use 150 gross square feet per person, while mercantile retail areas use 60 square feet per person.


Need commercial TI permit drawings drafted fast? Request a written quote within 2 working hours at ArchWorkPro Get Started or view our drafting capabilities at ArchWorkPro Permit Sets.

Get Your Plans Drafted

$1/sq ft, $1,200 minimum. Delivered in days, with no full-service package required, just the drawings.

Get My Quote →